Operation test for emergency power generator

Date

2024年5月21日 (火) 14:00 15:00

Description

Operation test for emergency power generator will be carried out.

At the beginning and ending of the operation test, 10-15 seconds of power shut down for the emergency power circuit will occur. However, they will not affect sea water supply and electricity supply for equipment should automatically come back up.

We will check all equipment during the test.

All-OIST Category: 

Subscribe to the OIST Calendar: Right-click to download, then open in your calendar application.