Maintenance work on heat-exchanger system

Date

2024年8月6日 (火) (All day)

Description

Replacement of heating & cooling water will be carried out. A few vendor staff will be working at outside around heat-exchanger system.

All-OIST Category: 

Subscribe to the OIST Calendar: Right-click to download, then open in your calendar application.