Maintenace work for heat-exchanger system

Date

Friday, June 21, 2024 - 09:30 to 13:00

Description

Maintenace work for the chiller parts in heat-exchanger system will be carried out. This work will not affect the temperatures and water running in the system.

All-OIST Category: 

Subscribe to the OIST Calendar: Right-click to download, then open in your calendar application.