Scheduled Power Outage
Date
Location
Description
Notice of Power Outages
If you have any questions, please contact us at https://oist.service-now.com/bfmsp.
Thank you for your understanding and cooperation.
Facilities
Main Campus
(Lab1, 2, 3, 4, Center Building, ESB, CDC, Conference Center,
Tunnel Gallery, and all Housing)
*Incubation Center will not be impacted
Date
June 10, 2022 (FRI)
Time
15:00 – 15:50
*Two 2-minute power outages will occur during the above time period.
* An announcement will be made 5 minutes prior to the power outage via the building's public address system.
Note
Please keep the following points in mind on the day of the event.
- Shut down PCs, printers, fax machines, etc. in advance.
- Turn off all important research equipment in advance. You will need to Switch on power to equipment after the power is restored.
- Air conditioning will be automatically restored after the power is restored or contact the Bosai Center if the A/C is not restored.
- Elevators will be out of service between 14:45-15:50.
- Please stop using flammable gases (hydrogen, methane, etc) and oxygen gas will stop. They will recover by 16:30.
- For any other electrical equipment malfunctions, please contact the Bosai Center.
Bosai Center: 098-966-8861 or 098-966-8884
Buildings and Facilities Management Division
Attachments
Subscribe to the OIST Calendar: Right-click to download, then open in your calendar application.